top of page
Keith's Engine was the first to run on the track.


Ken working on track alignment.

Ken has designed and built a hopper for depositing filling between the tracks.

Robin trying out Paul's engine.

Wide Bay Cranes boring a hole and installing the pole for our security cameras.


Moving and installing our new sign.





bottom of page